Project no Project name Island Funding source Summary Sort ascending Project status Contractor name Project cost Status
ER-VI-9999(138) Temporary Traffic Control St. Croix FHWA-Emergency Repairs Temp Traffic Control STX Procurement Process Pending 3,08,750.00 Procurement
ER-VI-9999(137) Temporary Traffic Control St. Thomas FHWA-Emergency Repairs Temp Traffic Control STT/STJ Construction Four Star Construction 5,91,250.00 Active Construction
ER-VI-35(2) Route 35 - 0.5 St. Thomas FHWA-Emergency Repairs Retaining Wall(Rte 35) Construction Four Star Construction 9,69,321.00 Active Construction
VI ST ER STT(005) Route 33 - Shibui St. Thomas FHWA-Emergency Repairs Retaining Wall and Drainage Repairs on Route 33- Shibui Prelim Eng: Design in Progress $70,147.48 Design
VI ST ER STJ(002), STT(004) Route 104 - Site 1 (Southside Road) St. John FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 5 sites on St. John damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD TBD Procurement
VI ST ER STJ(002), STT(004) Route 104 - Site 2(Southside Road) St. John FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 5 sites on St. John damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD TBD Procurement
VI ST ER STJ(002), STT(004) Route 107 St. John FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 5 sites on St. John damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD TBD Procurement
VI ST ER STJ(002), STT(004) Route 108 Bordeaux Mountain Road St. John FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 5 sites on St. John damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD TBD Procurement
VI ST ER STJ(002), STT(004) Route 1041 Fish Bay Road St. John FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 5 sites on St. John damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD TBD Procurement
VI ST ER STX(003) Route 64- East Airport Road Bridge St. Croix FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 16 sites on St. Croix damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD Contruction: $10,660,446.43 Prelim. Engineering: $115,507.48 Procurement
VI ST ER STX(003) Route 72 - MP 1.4 Midland Road Bridge St. Croix FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 16 sites on St. Croix damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD Contruction: $10,660,446.43 Prelim. Engineering: $115,507.49 Procurement
VI ST ER STX(003) Route 7532 - MP 0.02 (Gallows Bay Road) St. Croix FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 16 sites on St. Croix damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD Contruction: $10,660,446.43 Prelim. Engineering: $115,507.50 Procurement
VI ST ER STX(003) Route 82 - MP 0.5 (East End Road) St. Croix FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 16 sites on St. Croix damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD Contruction: $10,660,446.43 Prelim. Engineering: $115,507.51 Procurement
VI ST ER STX(003) Route 82 - MP 2.5 (East End Road) St. Croix FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 16 sites on St. Croix damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD Contruction: $10,660,446.43 Prelim. Engineering: $115,507.52 Procurement
VI ST ER STX(003) Route 82 - MP 3.5 (East End Road) St. Croix FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 16 sites on St. Croix damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD Contruction: $10,660,446.43 Prelim. Engineering: $115,507.53 Procurement
VI ST ER STX(003) Route 753 (Mt Welcome Road) St. Croix FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 16 sites on St. Croix damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD Contruction: $10,660,446.43 Prelim. Engineering: $115,507.54 Procurement
VI ST ER STX(003) Route 763 - MP 0.0 St. Croix FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 16 sites on St. Croix damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD Contruction: $10,660,446.43 Prelim. Engineering: $115,507.55 Procurement
VI ST ER STX(003) Route 765 - MP 0.0 (Annaly Road) St. Croix FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 16 sites on St. Croix damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD Contruction: $10,660,446.43 Prelim. Engineering: $115,507.56 Procurement
VI ST ER STX(003) Rotue 63 - MP 0.9 Concordia Road St. Croix FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 16 sites on St. Croix damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD Contruction: $10,660,446.43 Prelim. Engineering: $115,507.57 Procurement
VI ST ER STX(003) Route 66 - MP 2.9 Melvin Evans Highway St. Croix FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 16 sites on St. Croix damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD Contruction: $10,660,446.43 Prelim. Engineering: $115,507.58 Procurement
VI ST ER STX(003) Route 78 - West Scenic Road in Sweet Bottom St. Croix FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 16 sites on St. Croix damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD Contruction: $10,660,446.43 Prelim. Engineering: $115,507.59 Procurement
VI ST ER STX(003) Route 80 - MP 0.8 North Shore Road St. Croix FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 16 sites on St. Croix damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD Contruction: $10,660,446.43 Prelim. Engineering: $115,507.60 Procurement
VI ST ER STX(003) Route 80 North Shore Road- East Culverts St. Croix FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 16 sites on St. Croix damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD Contruction: $10,660,446.43 Prelim. Engineering: $115,507.61 Procurement
VI ST ER STX(003) Route 80 North Shore Road - West Single Culvert St. Croix FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 16 sites on St. Croix damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD Contruction: $10,660,446.43 Prelim. Engineering: $115,507.62 Procurement
VI ST ER STX(003) Route 732 Windor Road St. Croix FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 16 sites on St. Croix damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress TBD Contruction: $10,660,446.43 Prelim. Engineering: $115,507.63 Procurement
VI ST ER STJ(002), STT(004) Route 333 - Site 1 St. Thomas FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 13 sites on St. Thomas damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress Contruction: $19,766,422.33 Prelim. Engineering: $105,932.79 Procurement
VI ST ER STJ(002), STT(004) Route 334 - Site 3 (Crown Mountain Road) St. Thomas FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 13 sites on St. Thomas damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress Contruction: $19,766,422.33 Prelim. Engineering: $105,932.80 Procurement
VI ST ER STJ(002), STT(004) Route 335 - Site 1 St. Thomas FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 13 sites on St. Thomas damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress Contruction: $19,766,422.33 Prelim. Engineering: $105,932.81 Procurement
VI ST ER STJ(002), STT(004) Route 33 - Shibui St. Thomas FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 13 sites on St. Thomas damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress Contruction: $19,766,422.33 Prelim. Engineering: $105,932.82 Procurement
VI ST ER STJ(002), STT(004) Route 30 - MP 0.9 (Fortuna Road) St. Thomas FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 13 sites on St. Thomas damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress Contruction: $19,766,422.33 Prelim. Engineering: $105,932.83 Procurement
VI ST ER STJ(002), STT(004) Route 30 - Black Point Hill to Daisy RB St. Thomas FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 13 sites on St. Thomas damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress Contruction: $19,766,422.33 Prelim. Engineering: $105,932.84 Procurement
VI ST ER STJ(002), STT(004) Route 33 & 40 St. Thomas FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 13 sites on St. Thomas damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress Contruction: $19,766,422.33 Prelim. Engineering: $105,932.85 Procurement
VI ST ER STJ(002), STT(004) Route 33 - Site 3 St. Thomas FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 13 sites on St. Thomas damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress Contruction: $19,766,422.33 Prelim. Engineering: $105,932.86 Procurement
VI ST ER STJ(002), STT(004) Route 37 - Site 6 Hull Bay Road St. Thomas FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 13 sites on St. Thomas damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress Contruction: $19,766,422.33 Prelim. Engineering: $105,932.87 Procurement
VI ST ER STJ(002), STT(004) Route 38 Weymouth Rhymer Road St. Thomas FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 13 sites on St. Thomas damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress Contruction: $19,766,422.33 Prelim. Engineering: $105,932.88 Procurement
VI ST ER STJ(002), STT(004) Route 42 - MP 1.3 (Mandal Road) St. Thomas FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 13 sites on St. Thomas damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress Contruction: $19,766,422.33 Prelim. Engineering: $105,932.89 Procurement
VI ST ER STJ(002), STT(004) Route 379 - Site 7 (Area 1 & 2) (Alexander Gade Road ) St. Thomas FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 13 sites on St. Thomas damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress Contruction: $19,766,422.33 Prelim. Engineering: $105,932.90 Procurement
VI ST ER STJ(002), STT(004) Route 3017 (Vested Gade Road) St. Thomas FHWA-Emergency Repairs Rehabilitation of roadways, culverts, embankments, and other roadway features of 13 sites on St. Thomas damaged by Hurricanes Irma and Maria. Design-Build (DB) procurement in progress Contruction: $19,766,422.33 Prelim. Engineering: $105,932.91 Procurement
North Side Road St. Thomas CDBG-DR Rehabilitation of Roadway Procurement still in Negotiations for an A& E firm. $5,00,00,000.00 Procurement
Donoe Road St. Thomas CDBG-DR Rehabilitation of Roadway Contract process of awarding the design to Kimley Horn. Anticpate starting early 2021 for Design. $1,62,53,869.97 Contract Execution
Queen Mary Highway St. Croix CDBG-DR Rehabilitation of Roadway Application still at HFA for consideration pending approval for design. HFA to reach out to DPW to work on cost assessment analysis $9,67,49,226.01 Procurement
Hospital Gade, Mafolie Road St. Thomas CDBG-DR Rehabilitation of Roadway Application Development $1,06,03,715.17 Project Development
Bolongo Road St. Thomas CDBG-DR Rehabilitation of Roadway Application Development $2,56,96,594.43 Project Development
Centerline Road St. Croix CDBG-DR Rehabilitation of Roadway Application still at HFA for consideration pending approval for design. HFA to reach out to DPW to work on cost assessment analysis $2,25,23,219.81 Procurement
Veterans Drive St. Thomas CDBG-DR Rehabilitation of Roadway Phase II in Design Process $10,00,00,000.00 Design
0066012 Melvin Evans Highway St. Croix GARVEE BONDS Rehabilitation of Roadway In Construction. Project broken up into six segments. Three segments are complete. Two segments are in active construction (17 is 75% and 14 is 50%). One segment (13) in final design phase. VI-66(12) - VI Paving, VI-66(15) - VI Paving, VI-66(16) - VI Paving, VI-66(14) - VIAPCO, VI-66(17) - VI Paving 1,50,00,000.00 Active Construction
9999136 Frederiksted Roads (Routes 7023,7025,7027,7029,702) St. Croix GARVEE BONDS Rehabilitation of Roadway VI-9999(13)  Consultant design plans FHWA review. Will go to bid 2020. TBD 30,00,000.00 Design
9999135 Christiansted Roads (75E,75W,754) St. Croix GARVEE BONDS Rehabilitation of Roadway In design (EFL) TBD 30,00,000.00 Design
63001 Hams Bluff Road St. Croix GARVEE BONDS Rehabilitation of Roadway Developing RFP for design services TBD 70,00,000.00 Project Development
76001 Mahogany Road St. Croix GARVEE BONDS Rehabilitation of Roadway Consultant design in progress (95%).  Bid late 2020. TBD 80,00,000.00 Design

About Us

The Virgin Islands Department of Public Works (DPW) is mandated to plan, construct and maintain our public roads, highways, storm drainage systems, buildings, transportation systems, parking facilities and cemeteries.

Contact Us

ST. THOMAS OFFICE

Phone: (340) 776-4844
8244 Sub Base
Charlotte Amalie, VI 00802

ST. CROIX OFFICE

Phone: (340) 773-1290
6002 Annas Hope
Christiansted, VI 00820

ST. JOHN OFFICE

Phone: (340) 776-6346
6 Susannaberg
Cruz Bay, VI 00830