Featured Projects
The Virgin Islands Department of Public Works takes pride in working as a team to deliver quality projects and services to the people of the Virgin Islands. We work to keep the Virgin Islands beautiful, safe, and sustainable for residents and visitors.
Project List
Name | Location | User Agency | Funding Source 1 | Project Phase | Design Firm | Contractor | Contract Amt | Planned Finish | Target Const End |
---|---|---|---|---|---|---|---|---|---|
Relocation to HOVENSA training school (STX) | STX | BMV | LOCAL | Design | Jaredian | TBD | |||
BOC-Mold Remediation Project | STX | BOC | FEMA | Design | DPW | TBD | |||
BOC Golden Grove Perimeter Roads & Parking Lot | STX | BOC | FEMA | Construction-Contracting | DPW | VI Paving | 2022-04-19 00:00:00 | ||
BOC Perimeter Lighting | STX | BOC | FEMA | Construction-Contracting | DPW | Heights Construction and Supply, Inc. | 2022-06-02 00:00:00 | ||
Golden Grove Adult Correction Facility - Roof (John A. Bell Facility) | STX | BOC | FEMA | Construction | Custom Builders | $881,721 | 2022-08-17 00:00:00 | 2022-10-24 00:00:00 | |
BOC Security Fence | STX | BOC | LOCAL-PFA | Close-out | DPW | D.V.D. Construction, Inc | $234,688 | 2022-03-22 00:00:00 | 2022-07-15 00:00:00 |
Anna's Hope Head Start Admin & Warehouse | STX | DHS | FEMA | Design | DPW | TBD | |||
Mars Hill Headstart Generator Room (STX) | STX | DHS | FEMA | Construction-Solicitation | DPW | TBD | |||
Richmond Senior Center ADA Bathroom | STX | DHS | LOCAL-PFA | Construction | DPW | D.V.D. Construction, Inc | |||
Herbert Grigg Home-Roof Repairs | STX | DHS | LOCAL-PFA | Close-out | DPW | D.V.D. Construction, Inc | $281,426.5 | 2022-03-22 00:00:00 | 2022-04-05 00:00:00 |
Richmond Senior Center Bathroom Repairs | STX | DHS | LOCAL-PFA | Close-out | DPW | D.V.D. Construction, Inc | $135,000 | 2022-03-22 00:00:00 | 2022-06-24 00:00:00 |
Charles H. Emmanuel Headstart | STX | DHS | OHS | Design | CPH | TBD | |||
Annas Hope Head Start Center | STX | DHS | OHS | Construction-Solicitation | CPH | TBD | |||
Concordia Head Start | STX | DHS | OHS | Construction-Solicitation | CPH | TBD | |||
Camera Surveillance Project - (6 STX, ) | STX | DHS | OHS | Construction | DPW | B Tech Contracting Group, LLC. | $81,104 | 2022-09-28 00:00:00 | |
Head Start Playground Project - (7 STX) | STX | DHS | OHS | Construction | DPW | Custom Builders | $2,046,883.13 | 2022-03-22 00:00:00 | 2022-11-23 00:00:00 |
DLCA Storage Facility | STX | DLCA | FEMA | Construction | DPW | D.V.D. Construction, Inc | $20,200 | 2021-12-25 00:00:00 | 2022-01-09 00:00:00 |
DOA Modular Building Temporary Office (STX) | STX | DOA | FEMA | Completed | DPW | Nuvo Construction | $58,880.4 | 2021-09-08 00:00:00 | |
Mechanic Shop Repairs (STX) DOA | STX | DOA | FEMA | Completed | DPW | Heights Construction and Supply, Inc. | $270,240 | 2022-03-22 00:00:00 | |
Charles Harwood Complex-Master Planning & Design Services | STX | DOH | FEMA | Construction | FLAD | Lemartec | $8,410,251 | 2023-10-24 00:00:00 | |
Temporary Parking Lot (Charles Harwood) | STX | DOH | FEMA | Close-out | CMA Architect & Engineering, LLC | J. Benton Construction | $1,321,917.92 | 2022-05-26 00:00:00 | |
Frederiksted WIC Building | STX | DOH | USDA-FNS | Construction | Springline | Heights Construction and Supply, Inc. | $670,550.76 | ||
DOJ Morgue & Atopsy Facility | STX | DOJ | TBD | Design | DPW | TBD | |||
Security Fence | STX | DOJ | TBD | Construction-Contracting | DPW | Tang Howe Brothers | |||
Office Building Annex Renovations (STX) | STX | DOP | TBD | Construction | DPW | ||||
Repairs to the La Reine Bus Transfer Terminal | STX | DOT | FTA | Completed | 3W Enterprises | $34,648.5 | 2022-06-21 00:00:00 | 2022-06-22 00:00:00 | |
Frederiksted (Anthalie Peterson) Library (STX) | STX | DPNR | FEMA | Construction-Solicitation | DPW | TBD | |||
Florence Williams Public Library | STX | DPNR | FEMA | Construction | DPW | Heights Construction and Supply, Inc. | $702,775.5 | 2022-11-20 00:00:00 | |
Generator Room (STX) for Enforcement Office | STX | DPNR | FEMA | Close-out | DPW | Heights Construction and Supply, Inc. | $110,692 | 2022-03-22 00:00:00 | |
Fort Frederik Musuem | STX | DPNR | TBD | Design | Springline | TBD | |||
Frederiksted Town & Waterfront Lighting & Miscellaneous Repairs | STX | DPW | Design | DPW | |||||
East End (Rt. 81) Road Repairs - Chenay Bay to Solitude | STX | DPW | ARPA | Construction | DPW | VI Paving | $899,971.8 | 2022-04-20 00:00:00 | 2022-12-31 00:00:00 |
East End (Rt. 81) Road Repairs - Buccaneer to Chenay Bay | STX | DPW | ARPA | Construction | DPW | VI Paving | $901,446.8 | 2022-12-31 00:00:00 | |
East End Road Repairs (Rt. 82) from Teague Bay to Tamarind Reef | STX | DPW | ARPA | Construction | DPW | Marco St. Croix | $451,386.18 | 2022-12-31 00:00:00 | |
East End Road Repairs (Solitude to Teague Bay) | STX | DPW | ARPA | Construction | DPW | VIAPCO | $807,252.4 | 2022-12-31 00:00:00 | |
Estate Richmond Road Repairs - Phase 2 (Vicinity of property and procurement) | STX | DPW | ARPA | Construction | DPW | VIAPCO | $389,081.2 | 2022-04-07 00:00:00 | 2022-10-31 00:00:00 |
Estate St. Georges Road Repairs - Phase 3 | STX | DPW | ARPA | Construction | DPW | Marco St. Croix | $1,535,140.5 | 2022-08-31 00:00:00 | |
Peter's Rest Residential Road | STX | DPW | ARPA | Construction | DPW | VIAPCO | $427,567.14 | 2022-10-31 00:00:00 | |
Queen Mary Hwy: Paradise Intersection | STX | DPW | ARPA | Construction | DPW | Marco St. Croix | $34,999 | 2022-08-31 00:00:00 | |
Union & Mt. Washington Road Repairs -Phase 2 | STX | DPW | ARPA | Construction | DPW | VIAPCO | $792,642.8 | 2022-09-30 00:00:00 | |
Whim Road Repairs -Phase 1 | STX | DPW | ARPA | Construction | DPW | VI Paving | |||
Campo Rico - Phase 2 | STX | DPW | ARPA | Close-out | DPW | VI Paving | $371,949.06 | 2022-10-31 00:00:00 | |
Hermon Hill Road - Phase 4 | STX | DPW | ARPA | Close-out | DPW | VI Paving | $555,258.8 | 2022-08-31 00:00:00 | |
King Street Road Repairs- From Basin Triangle signal Light to Time Square in the vicinity Thomas Bakery | STX | DPW | ARPA | Close-out | DPW | VI Paving | $428,658.09 | 2022-04-07 00:00:00 | |
Queen Mary Repairs- UVI to Central HS | STX | DPW | ARPA | Close-out | DPW | Marco St. Croix | $745,000 | 2022-03-22 00:00:00 | 2022-10-31 00:00:00 |
Northside Road (Rt. 75) Repairs from Pueblo signal light to Basin Triangle | STX | DPW | ARPA | Completed | DPW | VI Paving | $642,377.25 | 2022-02-28 00:00:00 | 2022-08-31 00:00:00 |
Northside Road (Rt. 75) Repairs from Pueblo signal light to Five Corners Signal Light | STX | DPW | ARPA | Completed | DPW | VI Paving | $587,364.96 | 2022-02-28 00:00:00 | 2022-08-31 00:00:00 |
Upper Love Road - Phase 2 | STX | DPW | ARPA | Completed | DPW | VIAPCO | $269,624 | 2022-11-30 00:00:00 | |
Work and Rest - Phase 2 | STX | DPW | ARPA | Completed | DPW | Marco St. Croix | $136,022.6 | 2022-05-04 00:00:00 | |
Christiansted Road Repairs. Queen, Strand, Hill, East, West, Smith, Prince and Market Street. | STX | DPW | DOI | Construction-Solicitation | DPW | TBD | 2022-04-20 00:00:00 | ||
Frederiksted Road Repair -Phase II - King Cross St, East St, Veteran's Shore Drive, Route 702 | STX | DPW | DOI | Construction | DPW | Consolidated Asphalt & Civil Works LLC. | $987,266 | 2022-10-20 00:00:00 | 2022-02-22 00:00:00 |
Frederiksted Road Repairs Phase 1. (Queen Cross, Hill, Hospital, New, King, Customs, Lagoon and Market Street) | STX | DPW | DOI | Completed | DPW | VI Paving | $1,483,843.75 | 2022-03-14 00:00:00 | 2022-02-25 00:00:00 |
Estate Mountain Road 1 (Project 1) | STX | DPW | FEMA | Project Development | TBD | TBD | 2024-03-01 00:00:00 | ||
Long Point Bay Water - Roads (project 1) EO | STX | DPW | FEMA | Project Development | TBD | TBD | 2027-09-30 00:00:00 | 2025-07-31 00:00:00 | |
Estate Paradise Drainage Improvements - Phase 1 | STX | DPW | FEMA | Design-Solicitation | TBD | TBD | 2023-06-30 00:00:00 | ||
Estate Mt Pleasant (Project 1) | STX | DPW | FEMA | Design | WOB | TBD | 2026-07-31 00:00:00 | 2025-12-31 00:00:00 | |
Frederiksted Office Building | STX | DPW | FEMA | Design | Jaredian | TBD | $381,000 | 2021-04-02 00:00:00 | 2024-06-30 00:00:00 |
Gallows Bay Drainage Improvements - Phase 1 | STX | DPW | FEMA | Design | NV5 | TBD | $499,476.6 | 2023-06-30 00:00:00 | 2024-06-30 00:00:00 |
Hannah's Rest Drainage Improvements-Phase 1 | STX | DPW | FEMA | Design | Kimley Horn | TBD | $330,000 | 2023-03-31 00:00:00 | 2024-03-01 00:00:00 |
Kingshill Cemetery Chapel, Building | STX | DPW | FEMA | Design | Jaredian | TBD | $98,000 | 2024-01-01 00:00:00 | 2024-06-30 00:00:00 |
La Reine Drainage Improvements - Phase 1 | STX | DPW | FEMA | Design | TBD | TBD | $345,762.95 | 2023-12-31 00:00:00 | 2024-12-31 00:00:00 |
Mahogany Road Drainage Improvements - Phase 1 | STX | DPW | FEMA | Design | Stanley Consultants | TBD | $354,389 | 2023-06-30 00:00:00 | 2023-12-31 00:00:00 |
Northside Drainage Improvements - Phase 1 | STX | DPW | FEMA | Design | Stanley Consultants | TBD | $350,601 | 2023-04-01 00:00:00 | 2025-12-31 00:00:00 |
St. Croix Public Works Compound - Anna's Hope | STX | DPW | FEMA | Design | Jaredian | TBD | $995,000 | 2022-01-01 00:00:00 | 2027-10-31 00:00:00 |
Temporary Facility at Anna's Hope Compound on St. Croix | STX | DPW | FEMA | Design | Jaredian | TBD | 2024-01-31 00:00:00 | 2024-06-30 00:00:00 | |
Williams Delight Part-1 (Project 1) | STX | DPW | FEMA | Design | WOB | TBD | 2021-05-19 00:00:00 | 2025-07-31 00:00:00 | |
Blue Mountain Road (Project 1) | STX | DPW | FEMA | Close-out | TBD | TBD | |||
Kingshill Cemetery Parking Lot | STX | DPW | FEMA | Close-out | WOB | VI Paving | $624,564.5 | 2022-04-22 00:00:00 | 2022-05-31 00:00:00 |
Carlton Road | STX | DPW | FEMA | Completed | DPW | Marco St. Croix | $59,708.3 | 2021-01-01 00:00:00 | 2021-03-25 00:00:00 |
Christiansted Boardwalk | STX | DPW | FEMA | Completed | DPW | Polaris Engineering Construction | $122,296.26 | 2022-02-18 00:00:00 | 2021-01-25 00:00:00 |
Estate All for the Better (Project 1) | STX | DPW | FEMA | Program Review | TBD | TBD | 2026-12-01 00:00:00 | ||
Christiansted Roads | STX | DPW | FHWA | Design | Eastern Federal Lands | TBD | 2024-12-31 00:00:00 | ||
Frederiksted Roads | STX | DPW | FHWA | Design | Antillean Engineering | TBD | 2022-12-31 00:00:00 | ||
Mahogany Road | STX | DPW | FHWA | Design | Stanley Consultants | TBD | 2025-08-31 00:00:00 | ||
Rattan Road | STX | DPW | FHWA | Design | DPW | TBD | 2025-06-30 00:00:00 | ||
Spring Gut | STX | DPW | FHWA | Design | Stanley Consultants | TBD | 2025-08-31 00:00:00 | ||
VI ST ER DESIGN BUILD STX | STX | DPW | FHWA | Design | Eastern Federal Lands | VI Paving | $10,947,806.43 | 2020-09-28 00:00:00 | 2023-02-10 00:00:00 |
Clifton Hill Reconstruction, Geometry and Safety Improvements | STX | DPW | FHWA | Construction | Stanley Consultants | Grace Civil | $9,587,505 | 2023-06-30 00:00:00 | |
Freewill Baptist to Bunkers | STX | DPW | FHWA | Construction | DPW | VI Paving | $7,991,029 | 2019-01-01 00:00:00 | 2022-03-15 00:00:00 |
Melvin Evans Good Hope to Williams Delight {VI-66(13)} | STX | DPW | FHWA | Construction | DPW | VI Paving | $11,076,350 | 2022-12-22 00:00:00 | |
Permanent Traffic Signs STX | STX | DPW | FHWA | Construction | DPW | Celestine Construction | $943,415 | 2019-10-30 00:00:00 | 2022-08-31 00:00:00 |
Carlton Road | STX | DPW | FHWA | Completed | DPW | Marco St. Croix | $3,099,662.2 | 2022-02-14 00:00:00 | 2022-03-04 00:00:00 |
Temp Traffic Control STX | STX | DPW | FHWA | Completed | DPW | VI Paving | $131,796.15 | 2019-09-18 00:00:00 | 2022-08-02 00:00:00 |
Hamm's Bluff | STX | DPW | FHWA | Program Review | TBD | TBD | 2025-12-31 00:00:00 | ||
VITRAN Operations & Maintenance Facility - STX | STX | DPW | FTA | Construction | Steve Hutchings | GEC | $6,700,000 | 2022-05-27 00:00:00 | 2022-11-30 00:00:00 |
Veterans Multi-Vault Crypt (STX) | STX | DPW | LOCAL | Design | DPW | TBD | |||
Strand Street Parking Lot | STX | DPW | LOCAL | Construction | DPW | Caribbean Contracting Services | $149,995 | 2022-11-06 00:00:00 | |
Strand Street Parking Lot Cashier Booth Repairs | STX | DPW | LOCAL-GENERAL FUND | Construction-Solicitation | DPW | ||||
William's Delight Road Repairs | STX | DPW | LOCAL-PFA | Construction | DPW | Marco St. Croix | $448,090.65 | 2022-11-30 00:00:00 | |
Calquohoun Road Repairs | STX | DPW | LOCAL-PFA | Completed | DPW | Marco St. Croix | $149,660.41 | 2022-04-07 00:00:00 | 2022-02-28 00:00:00 |
Campo Rico Road Repairs at Campo Rico in the vicinity of Plot No. 300 | STX | DPW | LOCAL-PFA | Completed | DPW | VI Paving | $793,383.53 | 2022-04-07 00:00:00 | 2021-11-30 00:00:00 |
Catherine's Rest Road Repairs Route 83, the road leading into Catherine's Rest Community | STX | DPW | LOCAL-PFA | Completed | DPW | VI Paving | $749,234.19 | 2022-04-07 00:00:00 | 2021-11-30 00:00:00 |
Estate Bugby Hole Residential Road Repairs - Phase 2 | STX | DPW | LOCAL-PFA | Completed | DPW | VI Paving | $1,799,475 | 2022-05-20 00:00:00 | |
Estate Bugby Hole Road Repairs - Phase 1 | STX | DPW | LOCAL-PFA | Completed | DPW | VI Paving | $1,857,945 | 2022-04-07 00:00:00 | 2021-11-20 00:00:00 |
Estate Hermon Hill Residential Road Repairs - Phase 2 | STX | DPW | LOCAL-PFA | Completed | DPW | VI Paving | $1,151,073 | ||
Estate Hermon Hill Road Repairs - Phase 1 | STX | DPW | LOCAL-PFA | Completed | DPW | VI Paving | $676,520 | 2022-04-07 00:00:00 | 2022-03-16 00:00:00 |
Estate LaReine Residential Road Repairs - Phase 2 | STX | DPW | LOCAL-PFA | Completed | DPW | VI Paving | $1,192,187 | 2022-04-07 00:00:00 | 2022-07-11 00:00:00 |
Estate LaReine Road Repairs - Phase 1 | STX | DPW | LOCAL-PFA | Completed | DPW | VI Paving | $1,421,144.67 | 2022-04-07 00:00:00 | 2021-11-20 00:00:00 |
Estate Richmond Road Repairs | STX | DPW | LOCAL-PFA | Completed | DPW | VIAPCO | $349,456 | 2022-04-07 00:00:00 | 2022-03-21 00:00:00 |
Estate St. Georges - Phase 1 | STX | DPW | LOCAL-PFA | Completed | DPW | VI Paving | $642,164 | 2022-04-07 00:00:00 | 2021-12-19 00:00:00 |
Estate St. John Road Repairs | STX | DPW | LOCAL-PFA | Completed | DPW | Marco St. Croix | $144,295.41 | 2022-04-07 00:00:00 | 2021-12-17 00:00:00 |
Mt. Pleasant East Road Repairs | STX | DPW | LOCAL-PFA | Completed | DPW | VIAPCO | $198,202.53 | 2022-04-07 00:00:00 | 2021-12-16 00:00:00 |
St. Georges Villas Residential Road Repairs - Phase 2 | STX | DPW | LOCAL-PFA | Completed | DPW | Heights Construction and Supply, Inc. | $387,831 | 2022-04-07 00:00:00 | 2021-12-17 00:00:00 |
Strawberry Hill Road Repairs | STX | DPW | LOCAL-PFA | Completed | DPW | VI Paving | $198,280.2 | 2022-04-07 00:00:00 | 2021-11-30 00:00:00 |
Union & Mt. Washington Road Repairs | STX | DPW | LOCAL-PFA | Completed | DPW | VIAPCO | $341,565 | 2022-04-07 00:00:00 | 2022-12-03 00:00:00 |
Upper Love Road Repairs | STX | DPW | LOCAL-PFA | Completed | DPW | Marco St. Croix | $499,968.72 | 2022-04-07 00:00:00 | 2021-11-30 00:00:00 |
Whim Road Repairs | STX | DPW | LOCAL-PFA | Completed | DPW | Marco St. Croix | $345,911.76 | 2022-04-07 00:00:00 | 2021-11-30 00:00:00 |
Work & Rest Residential Road Repairs | STX | DPW | LOCAL-PFA | Completed | DPW | Marco St. Croix | $397,451.23 | 2022-04-07 00:00:00 | 2021-11-30 00:00:00 |
Hermon Hill Road - Phase 3 | STX | DPW | TBD | Completed | DPW | VI Paving | $555,258.8 | 2022-06-03 00:00:00 | 2022-08-31 00:00:00 |
Arthur Abel Complex | STX | GH | FEMA | Design | Springline | TBD | |||
Sion Farm Building and Contents | STX | LGO | FEMA | Design | Springline | TBD | |||
Bethlehem Military Compound-Repair/Replace Walkway, Roadway, and Exterior Lights Project. | STX | NG | FEMA | Construction | DPW | Continental Construction & Engineering | $179,279.02 | 2022-07-14 00:00:00 | 2022-12-29 00:00:00 |
Modular Building Temporary Office (STX) | STX | P&P | TBD | Construction | DPW | Custom Builders | $305,558 | ||
Cramer's Park Concession Stand | STX | SP&R | FEMA | Design | Springline | TBD | |||
DC Canegata Generator Project | STX | SP&R | FEMA | Design | DPW | TBD | |||
DC Canegata Wind Retrofit for Recreational Ctr & Sports Complex | STX | SP&R | FEMA | Design | Springline | TBD | |||
Estate Profit Community Center | STX | SP&R | FEMA | Design | Springline | TBD | |||
Reinholdt Jackson Complex - STX (Estate Whim) | STX | SP&R | FEMA | Construction-Contracting | Springline | TBD | |||
Cramer's Park Pavilion | STX | SP&R | FEMA | Construction | Springline | D.V.D. Construction, Inc | $781,357.14 | 2022-03-22 00:00:00 | 2021-05-10 00:00:00 |
DC Canegata Complex PA | STX | SP&R | FEMA | Construction | Springline | TBD | |||
Rudy Krieger Park (Sion Farm) | STX | SP&R | FEMA | Construction | DPW | Custom Builders | $931,000 | 2023-01-25 00:00:00 | 2022-12-02 00:00:00 |
SPR Resurfacing & Restriping Various Courts-STX | STX | SP&R | FEMA | Construction | McCourt Construction | $368,569 | 2022-03-22 00:00:00 | 2022-11-05 00:00:00 | |
Vincent F. Mason Coral Resort & Pool | STX | SP&R | FEMA | Construction | Springline | Polaris Engineering Construction | $2,100,000 | 2022-08-04 00:00:00 | 2022-08-04 00:00:00 |
Campo Rico Basketball Court Playground (STX) | STX | SP&R | FEMA | Close-out | D.V.D. Construction, Inc | $51,200 | 2022-03-22 00:00:00 | ||
Composite Park Repairs | STX | SP&R | FEMA | Close-out | DPW | Custom Builders | $288,614.2 | 2022-03-22 00:00:00 | |
Frederiksted Beach Pavilion and Bathhouse | STX | SP&R | FEMA | Close-out | Springline | Polaris Engineering Construction | $236,774.37 | 2022-03-22 00:00:00 | |
Frederiksted Beach Pavilion and Bathhouse ADA Bathroom | STX | SP&R | FEMA | Close-out | DPW | 2023-02-28 00:00:00 | |||
Isaac Boynes Ballpark | STX | SP&R | FEMA | Close-out | DPW | D.V.D. Construction, Inc | $324,488 | 2022-05-01 00:00:00 | |
Pedro Cruz Ballpark | STX | SP&R | FEMA | Close-out | DPW | Polaris Engineering Construction | $211,966.76 | 2022-03-22 00:00:00 | |
Repairs to Various Parks | STX | SP&R | FEMA | Close-out | DPW | Polaris Engineering Construction | $422,729.64 | 2022-03-22 00:00:00 | 2022-11-21 00:00:00 |
Paul E. Joseph Stadium -STX | STX | SP&R | LOCAL-PFA | Construction | GEC | GEC | $27,000,000 | 2022-03-22 00:00:00 | 2023-05-22 00:00:00 |
Marley Beach Waterfront Renovations-Phase 1 | STX | SP&R | TBD | Construction-Contracting | DPW | TBD | |||
Arthur A. Richards Junior High School Demolition | STX | VIDE | FEMA | Close-out | Consolidated Asphalt & Civil Works LLC. | $3,806,634 | 2022-03-22 00:00:00 | 2022-06-30 00:00:00 | |
Evelyn Williams - Demolition | STX | VIDE | LOCAL-PFA | Construction | Eleven Construction | $3,387,341 | 2022-03-22 00:00:00 | 2022-10-14 00:00:00 | |
Charles Seales Fire Station-Phase 2 Design/Buildout | STX | VIFS | FEMA | Design | Jeffrey Boschulte | ||||
Emile Henderson Sr. Fire Station Hurricane Wind Retrofit & Saferoom | STX | VIFS | FEMA | Design | Springline | TBD | |||
Richmond Canegata Fire Station Safe Room & Generator Project | STX | VIFS | FEMA | Design | Jaredian | TBD | |||
Junior Fire Fighters Building Repairs (STX) | STX | VIFS | FEMA | Construction-Solicitation | DPW | TBD | |||
Charles Seales Fire Station-Phase 1 (Demolition) | STX | VIFS | FEMA | Construction-Contracting | Marco St. Croix | ||||
St. Croix Motor Pool Generator | STX | VIPD | FEMA | Design | DPW | TBD | |||
VIPD Training Academies Generators | STX | VIPD | FEMA | Design | DPW | TBD | |||
PAL Renovations (STX) | STX | VIPD | LOCAL | Design | DPW | TBD | |||
VIPD Adminstration Building | STX | VIPD | LOCAL-PFA | Construction | DPW | Polaris Engineering Construction | $578,501.78 | 2022-03-22 00:00:00 | 2022-07-30 00:00:00 |
Parking Garage for Mobile Satellite Unit | STX | WTJX | LOCAL-PFA | Completed | Mence Construction | $300,577.5 | 2022-03-22 00:00:00 | 2021-12-15 00:00:00 | |
St. John Multi-Purpose Center | STJ | DHS | FEMA | Design | DPW | ||||
St. John Modular Unit Purchase & Installation (2) | STJ | DHS | FEMA | Construction-Solicitation | DPW | TBD | |||
Cruz Bay Head Start Center | STJ | DHS | OHS | Design | CPH | TBD | |||
DOA Temporary Facility | STJ | DOA | FEMA | Design | DPW | TBD | |||
DPNR Offices on St. John | STJ | DPNR | FEMA | Design | TBD | ||||
Elaine Ione Sprauve Library | STJ | DPNR | FEMA | Construction | DPW | Four Star Construction | $383,950.19 | 2022-08-17 00:00:00 | 2022-11-16 00:00:00 |
Centerline Road - St. John (Previously 1st Avenue) | STJ | DPW | ARPA | Construction | DPW | Island Roads Corporation | $2,000,000 | 2022-07-29 00:00:00 | |
DPW Maintenance Building | STJ | DPW | FEMA | Design | Jaredian | TBD | 2026-03-31 00:00:00 | 2024-12-31 00:00:00 | |
Coral Bay & Maho Bay Watershed Project | STJ | DPW | FEMA | Construction | WOB | Island Roads Corporation | $579,352 | 2023-12-31 00:00:00 | 2023-09-30 00:00:00 |
Fish Bay Watershed | STJ | DPW | FEMA | Construction | WOB | Island Roads Corporation | $276,125 | 2023-12-31 00:00:00 | 2023-06-30 00:00:00 |
Great Cruz Bay Watershed Project | STJ | DPW | FEMA | Construction | WOB | Island Roads Corporation | $3,086,601 | 2023-12-31 00:00:00 | 2024-03-30 00:00:00 |
St. John DPW/EOC Building | STJ | DPW | FEMA | Program Review | DPW | J. Benton Construction | $469,437.93 | 2021-08-19 00:00:00 | 2022-04-30 00:00:00 |
STJ VITRAN Office Renovation | STJ | DPW | FTA | Design | DPW | TBD | |||
Centerline Road - St. John | STJ | DPW | LOCAL-PFA | Completed | DPW | Island Roads Corporation | $400,000 | 2022-04-04 00:00:00 | 2022-07-29 00:00:00 |
Estate Carolina-Coral Bay Road Repairs-STJ | STJ | DPW | LOCAL-PFA | Completed | DPW | Island Roads Corporation | $400,000 | 2022-07-29 00:00:00 | |
STJ Governor's House Rehab Battery | STJ | GH | FEMA | Close-out | Custom Builders | $1,274,564.28 | 2022-03-22 00:00:00 | ||
Oppenheimer Beach/Youth and Community Center Rebuild | STJ | SP&R | FEMA | Design | Harnel | TBD | |||
Winston Wells BallPark (Concession Stand & Bleachers Only)-70413 | STJ | SP&R | FEMA | Design | Harnel | TBD | |||
Cruz Bay Tennis Court & Orville Brown Basketball Court | STJ | SP&R | FEMA | Construction-Solicitation | DPW | TBD | 2022-04-12 00:00:00 | ||
Leander Jurgen Command-HMGP | STJ | VIPD | FEMA | Design | Harnel | TBD | |||
Leander Jurgen Command-PA | STJ | VIPD | FEMA | Design | Harnel | TBD | |||
BMV Main Building STT-Demolition | STT | BMV | FEMA | Construction-Solicitation | DPW | TBD | |||
BMV-Office Design Space -Tutu Park Mall | STT | BMV | LOCAL | Completed | DPW | Energy Efficient Builders | $114,074 | 2022-05-22 00:00:00 | 2022-05-22 00:00:00 |
Board of Education - Permanent Work | STT | BOE | FEMA | Design | TBD | ||||
Savan Head Start -1st Floor | STT | DHS | FEMA | Construction-Solicitation | DPW | TBD | 2022-04-12 00:00:00 | ||
Camera Surveillance Project (3 STT) | STT | DHS | FEMA | Close-out | DPW | Centurion | $17,005 | ||
DHS Bolongo Property-HeadStart Center | STT | DHS | OHS | Design | CPH | TBD | |||
Lindberg Bay HeadStart Center | STT | DHS | OHS | Design | CPH | TBD | |||
Minnetta Mitchell HeadStart | STT | DHS | OHS | Design | CPH | TBD | |||
Tabor and Harmony Mega Center | STT | DHS | OHS | Design | CPH | TBD | |||
Sugar Estate Generator Enclosure Project | STT | DHS | OHS | Construction-Solicitation | DPW | TBD | 2022-04-25 00:00:00 | ||
Head Start Playground Project - (3 STT) | STT | DHS | OHS | Construction | DPW | Custom Builders | $419,996.39 | 2022-02-01 00:00:00 | 2022-12-31 00:00:00 |
Bordeaux Farmer's Market | STT | DOA | FEMA | Design | DPW | TBD | |||
Dept. Of Agriculture Green House, Fencing, Ancillary Building | STT | DOA | FEMA | Design | DPW | TBD | |||
Reservoir and Reservoir Road (A&E project) | STT | DOA | FEMA | Construction-Solicitation | DPW | TBD | |||
DOF Bids A&F Rehab for OMB Offices | STT | DOF | FEMA | Close-out | Apex Construction | $1,158,286.6 | 2022-08-25 00:00:00 | ||
John S. Moorehead Complex (WIC Bldg Interior Repairs) | STT | DOH | FEMA | Design-Solicitation | |||||
Eldra Schulterbrandt Generator & Enclosure Project | STT | DOH | FEMA | Design | DPW | TBD | |||
Old Mental Health Building Demolition & Parking Lot Build-Out Project | STT | DOH | FEMA | Design | Springline | TBD | $71,500 | 2022-03-22 00:00:00 | |
Knud Hansen WIC Building Construction Project | STT | DOH | USDA-FNS | Construction | Springline | J. Benton Construction | $35,739,235 | 2023-09-29 00:00:00 | 2023-09-30 00:00:00 |
Knud Hansen WIC Building Demolition | STT | DOH | USDA-FNS | Completed | Springline | A-9 Trucking | $42,243.5 | 2022-03-22 00:00:00 | 2022-01-04 00:00:00 |
DOJ Child Paternity Office Repairs | STT | DOJ | FEMA | Design | DPW | TBD | |||
Improvement to the Dept. of Justice Office (Bldg Rep./Carpet Removal & Replacement) | STT | DOJ | FEMA | Design | DPW | TBD | 2023-07-14 00:00:00 | ||
Enid M. Baa Library & Archives-Bldg & Archive Restoration | STT | DPNR | FEMA | Design | Jaredian | TBD | |||
Hurricane Repairs to the Charles Wesley Turnbull Regional Library and Records Center | STT | DPNR | FEMA | Construction-Solicitation | Jaredian | 2022-08-31 00:00:00 | |||
Hazard Mitigation Treatment of Parcel F Estate Subbase (Old Wapa Building) | STT | DPNR | FEMA | Construction | Custom Builders | $687,424 | 2022-09-14 00:00:00 | 2022-09-15 00:00:00 | |
Charles W. Turnbull Library Parking Area Repairs (Lighting) | STT | DPNR | FEMA | Close-out | B Tech Contracting Group, LLC. | $186,972.7 | 2022-06-09 00:00:00 | 2021-11-30 00:00:00 | |
Krum Bay Dock 1& 2 Project | STT | DPNR | LOCAL-PFA | Design | 2023-01-04 00:00:00 | ||||
Gustave Quetel (Frenchtown) Fish Market Renovation | STT | DPNR | TBD | Design | DPW | TBD | |||
Donoe Road - Bottom | STT | DPW | ARPA | Construction | DPW | Island Roads Corporation | $209,563.97 | 2022-08-05 00:00:00 | |
Donoe Road - Top | STT | DPW | ARPA | Construction | DPW | Island Roads Corporation | $383,981.17 | 2022-08-05 00:00:00 | |
Estate Pearl - Additional | STT | DPW | ARPA | Construction | DPW | Island Roads Corporation | $376,753.78 | 2022-09-30 00:00:00 | |
Hidden Valley - Lower | STT | DPW | ARPA | Construction | DPW | Grace Civil | $472,949.05 | 2022-04-12 00:00:00 | 2022-06-17 00:00:00 |
New Tutu (Monster Hill) - Phase 1 | STT | DPW | ARPA | Construction | DPW | Grace Civil | $640,280.72 | 2022-07-15 00:00:00 | |
New Tutu (Monster Hill) - Phase 2 | STT | DPW | ARPA | Construction | DPW | Grace Civil | $523,236.22 | 2022-07-15 00:00:00 | |
RLS Intersection: Alton Adams Drive | STT | DPW | ARPA | Construction | DPW | Island Roads Corporation | $185,000 | 2022-08-05 00:00:00 | |
Contant - Phase 2 | STT | DPW | ARPA | Close-out | DPW | Grace Civil | $713,314.72 | 2022-07-08 00:00:00 | |
Hidden Valley - Upper Road | STT | DPW | ARPA | Close-out | DPW | Grace Civil | $695,161.95 | 2022-04-12 00:00:00 | 2022-06-17 00:00:00 |
Altona - Annas Fancy (Mahogany Estate) | STT | DPW | ARPA | Completed | DPW | Island Roads Corporation | $975,092.33 | 2022-08-31 00:00:00 | |
Contant - Phase 1 | STT | DPW | ARPA | Completed | DPW | Grace Civil | $906,913.66 | 2022-07-08 00:00:00 | |
Hull Bay - Additional | STT | DPW | ARPA | Completed | DPW | Grace Civil | $649,242.23 | 2022-07-09 00:00:00 | |
Mandahl Road-Additional | STT | DPW | ARPA | Completed | DPW | Island Roads Corporation | $574,808.93 | ||
Nicholas Friday Memorial Drive | STT | DPW | ARPA | Completed | DPW | Grace Civil | $505,210.92 | 2022-04-13 00:00:00 | |
Donoe Bypass | STT | DPW | CDBG | Design | Kimley Horn | TBD | $2,700,000 | 2026-12-31 00:00:00 | |
Northside Road | STT | DPW | CDBG | Design | Stanley Consultants | TBD | $3,678,512 | 2027-12-31 00:00:00 | |
Bolongo Bay Drainage-Phase 1 | STT | DPW | EPA | Construction | DPW | Rodriguez & Galand | $1,364,715.03 | 2022-02-15 00:00:00 | 2022-10-01 00:00:00 |
(STEER) East End Reserve Drainage Improvements - Phase 1 | STT | DPW | FEMA | Design-Solicitation | TBD | TBD | 2024-06-30 00:00:00 | 2025-06-30 00:00:00 | |
Cyril E. King Watershed and Fortuna Bay Watershed (Combined) - Project 1 | STT | DPW | FEMA | Design | WOB | TBD | 2025-08-31 00:00:00 | 2023-12-31 00:00:00 | |
Donoe Bypass Drainage Improvements - Phase 1 | STT | DPW | FEMA | Design | Kimley Horn | TBD | $414,705.5 | 2023-06-30 00:00:00 | 2026-03-31 00:00:00 |
Dorothea Bay Watershed (Combined) - Project 1 | STT | DPW | FEMA | Design | WOB | TBD | 2026-09-30 00:00:00 | 2023-12-31 00:00:00 | |
Jersey Bay and Smith Bay Watershed (Combined) - Project 1 | STT | DPW | FEMA | Design | WOB | TBD | 2026-10-31 00:00:00 | 2023-12-31 00:00:00 | |
Mandahl Bay Watershed - Project 1 | STT | DPW | FEMA | Design | WOB | TBD | 2026-01-31 00:00:00 | 2024-06-30 00:00:00 | |
Smith Bay Drainage Improvements - Phase 1 | STT | DPW | FEMA | Design | NV5 | TBD | $431,897 | 2023-06-30 00:00:00 | 2023-12-31 00:00:00 |
St. Thomas Bay Watershed (Combined) Project 1 | STT | DPW | FEMA | Design | WOB | TBD | 2026-01-31 00:00:00 | 2025-12-31 00:00:00 | |
Botany Bay, Perseverance Bay and Red Hook Bay Watersheds (Combined) Project | STT | DPW | FEMA | Construction | WOB | Rumina Construction | $802,362 | 2022-12-02 00:00:00 | 2023-04-30 00:00:00 |
Frenchman's Bay Watershed | STT | DPW | FEMA | Construction | WOB | Rumina Construction | $2,493,575 | 2022-12-02 00:00:00 | 2023-09-30 00:00:00 |
DPW Headquarters, Public Buildings and Other DPW Non-Road Facilities-TMUET83 | STT | DPW | FEMA | Program Review | Jaredian | TBD | 2026-02-28 00:00:00 | 2023-12-31 00:00:00 | |
Fish Fry Drainage and Stabilization Improvement - Phase 1 | STT | DPW | FEMA | Program Review | TBD | TBD | 2024-03-31 00:00:00 | 2024-12-31 00:00:00 | |
Retaining Wall (Rte 35) | STT | DPW | FHWA | Completed | DPW | Four Star Construction | $972,130.07 | 2019-09-13 00:00:00 | |
Veteran's Drive - Phase 1 | STT | DPW | FHWA | Completed | American Bridge Company | $48,861,218.26 | |||
VITRAN-STT-Storage Facility | STT | DPW | FTA | Construction-Contracting | DPW | TBD | 2023-04-21 00:00:00 | ||
Eastern Cemetery - Veterans Multi-Crypt (STT) | STT | DPW | LOCAL | Construction-Contracting | DPW | Rodriguez & Galand | |||
Fort Christian Parking Lot Conduit Installation Project | STT | DPW | LOCAL | Construction | DPW | Grace Civil | $97,190.5 | 2022-03-04 00:00:00 | 2022-10-20 00:00:00 |
Benner Hill Guardrail Installation Project | STT | DPW | LOCAL | Completed | L.E.B.G. Construction | $173,736 | 2021-01-01 00:00:00 | ||
Patching and Painting DPW Main Building | STT | DPW | LOCAL-GENERAL FUND | Construction | DPW | Caribbean Contracting Services | $71,000 | 2022-12-30 00:00:00 | |
Estate Thomas Road | STT | DPW | LOCAL-PFA | Design | DPW | TBD | 2022-07-31 00:00:00 | ||
Leonardo Trotman Drive | STT | DPW | LOCAL-PFA | Design | DPW | TBD | |||
5-21 Estate Lilliendahl & Marienhoj #3 Little Northside | STT | DPW | LOCAL-PFA | Construction | DPW | Island Roads Corporation | $300,000 | 2022-07-31 00:00:00 | |
Estate Lilliendahl Road Repairs | STT | DPW | LOCAL-PFA | Construction | DPW | Island Roads Corporation | $400,000 | 2022-07-31 00:00:00 | |
Estate Misgunst & Lerkenlund Road Repair | STT | DPW | LOCAL-PFA | Construction | DPW | Grace Civil | $1,000,000 | 2022-05-02 00:00:00 | 2022-07-29 00:00:00 |
Estate Pearl Road Repairs | STT | DPW | LOCAL-PFA | Construction | DPW | Island Roads Corporation | $300,000 | 2022-07-31 00:00:00 | |
Estate Smith Bay Road Repairs | STT | DPW | LOCAL-PFA | Construction | DPW | Rumina Construction | $700,000 | ||
Estate St. Peter & Lilliendahl/Marienhoj (Suicide Hill) | STT | DPW | LOCAL-PFA | Construction | DPW | Island Roads Corporation | $700,000 | 2022-07-23 00:00:00 | |
Prindsens Gade Estate Road Repair | STT | DPW | LOCAL-PFA | Construction | DPW | Grace Civil | $300,000 | 2022-03-31 00:00:00 | 2022-06-06 00:00:00 |
Estate Frenchman's Bay Road Repairs | STT | DPW | LOCAL-PFA | Completed | DPW | Grace Civil | $450,000 | 2022-04-04 00:00:00 | 2022-06-06 00:00:00 |
Estate Hope Road Repair | STT | DPW | LOCAL-PFA | Completed | DPW | Island Roads Corporation | $600,000 | 2022-06-06 00:00:00 | |
Estate Mandahl Road Repairs | STT | DPW | LOCAL-PFA | Completed | DPW | Island Roads Corporation | $450,000 | 2022-06-06 00:00:00 | |
Hospital Ground Road Repair | STT | DPW | LOCAL-PFA | Completed | DPW | Grace Civil | $300,000 | 2022-02-07 | 2022-06-06 00:00:00 |
Northstar Village Road Repair | STT | DPW | LOCAL-PFA | Completed | DPW | Grace Civil | $400,000 | 2022-07-09 | |
Governor's Annex Building | STT | GH | FEMA | Close-out | Polaris Engineering Construction | $80,197.6 | 2020-06-24 00:00:00 | ||
STT Governor's Mansion Rehab | STT | GH | FEMA | Close-out | J. Benton Construction | $5,141,138.08 | 2022-03-22 00:00:00 | 2022-03-24 | |
Pearson Garden Boxed Culvert Repair & 1st Avenue | STT | HA | TBD | Construction-Contracting | DPW | TBD | |||
Nisky Center Passport Office Renovations | STT | LGO | TBD | Construction | Jeffrey Boschulte | Energy Efficient Builders | $235,905.2 | 2022-02-01 00:00:00 | |
National Guard Guardhouse | STT | NG | FEMA | Design | DPW | TBD | |||
National Guard Fence | STT | NG | FEMA | Close-out | DPW | Custom Builders | $409,944 | 2022-02-01 00:00:00 | |
Design-Build Restrooms at Parcel No. 48 Norre Gade | STT | P&P | TBD | Construction | Custom Builders | $391,083 | 2022-04-19 00:00:00 | ||
Ninety-Nine (99) Steps | STT | PFA | LOCAL-PFA | Design | DPW | TBD | |||
Tennis Court Resurfacing & Restriping | STT | SP&R | DOI | Construction | DPW | McCourt Construction | $212,028.4 | 2021-12-10 00:00:00 | 2023-01-08 00:00:00 |
Alvin McBean Complex | STT | SP&R | FEMA | Construction-Solicitation | DPW | TBD | |||
Kirwin Terrace Ballpark---Sports, Parks and Recreation | STT | SP&R | FEMA | Construction-Contracting | TBD | TBD | |||
Emile Griffith Park | STT | SP&R | FEMA | Construction | Springline | Four Star Construction | $1,339,467 | 2022-09-14 | 2022-09-14 |
Joseph Aubain Ball Park | STT | SP&R | FEMA | Construction | Custom Builders | Custom Builders | $439,545 | 2022-10-07 | 2022-07-08 |
Lionel Roberts Stadium Hurricane Repair Project | STT | SP&R | FEMA | Construction | Polaris Engineering Construction | $741,978.15 | 2022-03-22 | 2023-03-19 | |
Newton Park in Estate Bordeaux (STT) | STT | SP&R | FEMA | Completed | DPW | MCE Contracting LLC. | $14,040 | 2022-03-22 | |
Magens Bay ADA Sidewalk Project | STT | SP&R | TBD | Construction | DPW | Continental Construction & Engineering | $125,733.15 | 2023-04-21 | |
Eastern Cemetery Columbarium (STT ) | STT | VA | LOCAL | Construction-Contracting | DPW | Rodriguez & Galand | |||
Emile C. Berry Fire Station Pt. 2 | STT | VIFS | FEMA | Construction-Solicitation | DPW | TBD | 2022-02-01 00:00:00 | ||
Omar Brown Fire Station (Hotel Company) | STT | VIFS | FEMA | Construction-Solicitation | DPW | TBD | |||
Emile C. Berry Fire Station Pt. 1 | STT | VIFS | FEMA | Construction-Contracting | DPW | TBD | 2022-03-22 00:00:00 | ||
George P. Scott Fire Station (Lima Company) Maint. Building | STT | VIFS | FEMA | Construction-Contracting | DPW | Caribbean Contracting Services | |||
VIPD Training Academies Generators-STT | STT | VIPD | FEMA | Design | DPW | TBD | |||
Bassanio David Command | STT | VIPD | FEMA | Construction-Contracting | DPW | TBD | |||
VITEMA - Emergency Operations Center (EOC) Retrofit - Phase 1 | STT | VTMA | FEMA | Construction | Jaredian | Custom Builders | $468,309.6 | ||
Water Island Watershed Project | WI | DPW | FEMA | Construction | WOB | Grace Civil | $2,805,532 | 2023-01-06 | 2024-03-30 |
Krum Bay water Island Dock Repair Project | WI | DPW | LOCAL-PFA | Construction | DPW | Stefferson Marine & Construction, LLC. | $49,750 | 2022-11-30 | 2022-11-30 |
Permanent Traffic Signs STT/STJ | STT/STJ | DPW | FHWA | Construction | DPW | Custom Builders | $1,294,738.13 | 2019-10-30 | 2022-08-31 |
VI ST ER DESIGN BUILD STT/STJ | STT/STJ | DPW | FHWA | Construction | Eastern Federal Lands | Island Roads Corporation | $24,290,274.04 | 2020-11-18 | 2022-12-31 |
Temp Traffic Control STT/STJ | STT/STJ | DPW | FHWA | Completed | DPW | Four Star Construction | $483,520 | 2019-05-29 | |
Territory Wide Culvert Analysis AA | STX/STT/STJ | DPW | FEMA | Project Development | TBD | TBD | 2026-06-30 | ||
Territory Wide Slope Stabilization Analysis AA | STX/STT/STJ | DPW | FEMA | Design-Solicitation | TBD | TBD | 2026-06-30 | ||
$299,672,378.89 |